Click Home tab > Family Editor panel > Load into Project. Click Manage tab >Settings panel > Project Parameters. In the Project Parameters dialog box, click the Add button. In the Parameter Properties dialog box, under Parameter Type select Shared Parameter.
Furthermore, how do I add text to a revision schedule in Revit? Click View tab Create panel (Revision Schedule). On the Fields tab of the Revision Properties dialog, add the fields to include in the schedule. These fields correspond to columns of the Sheet Issues/Revisions dialog for a project.
Moreover, which types of parameters can appear in Schedules Revit? Within Revit, there are three types of parameters: project, global and shared.
Subsequently, how do you add a sheet parameter in Revit?
You asked, how do you change a revision sequence in Revit?
In the project, click View tab Sheet Composition panel (Sheet Issues/Revisions).
In the Sheet Issues/Revisions dialog, click the sequence number for the revision to move.
Under Row, click Move Up or Move Down.
Click OK.
How do I add a column to a schedule in Revit?
In the Project Browser, select the schedule name.
On the Properties palette, for Formatting, click Edit.
Select the field to add a column total for, and select Calculate Totals.
Click OK.
How do I add a header to a Revit schedule?
Article inline ad #2
Open a schedule view.
In the group header rows, drag the cursor across the headings to group.
Click Modify Schedule/Quantities tab Headers panel Group, or right-click the selected headings, and click Group Headers.
Enter text in the new row as necessary.
How do I add a row to a schedule in Revit?
select any cell. Click (Insert Data Row) from the Rows panel. The new row displays at the bottom of the schedule. Enter values as desired.
How do you add revision without cloud in Revit?
This is simple to do, just add the revision note as normal in the revision’s manager, go to the relevant sheet and edit sheet revisions as shown in the image below. Amend other sheet revisions as appropriate, hiding any redundant clouds from previous revision issues within the revision’s interface.
How do you add a parameter to a schedule?
Tip: You can modify or add a shared parameter in the Fields tab of the Schedule Properties dialog. To modify a shared parameter, select it and click Edit under Scheduled fields. To add a new parameter, click Add Parameter. In both cases, the Parameter Properties dialog opens.